Our 2016/2017 Move to Clifton
After 17+ years in our former Bloomfield location, we officially opened in Clifton in January 2018. View photos and updates from the construction and transformation period below.
Updates September 2017
Updates April 2017
Progress!
We are making some steady progress and should be moved in during April of 2017.
With every step forward there is an obstacle to overcome!
09-19-2016
We are still in the construction phase due to many delays. Our finances are low, and we really need to get this building in shape ASAP. However, as with all construction projects, we have hit a few snags regarding delays, codes, time frames, etc., all of which prolongs our ability to transition the cats to the new location.
Our lease at our current location ends soon, so it is imperative that we try and push through as quick as possible. As we generally see in the summer, adoption and donation levels are low, but drop offs are high. That means we need to scrape up every penny we have just to be able to afford the expenses at our current location including rent, utilities, medical bills, and daily supplies - all while trying to cover the cost of the construction at the new location.
So far we have raised $1,901.00, and we are very grateful to our donors. Without our donors, we wouldn't have the ability to rescue and rehabilitate homeless cats. Thank you for continuing to support our mission!
Our lease at our current location ends soon, so it is imperative that we try and push through as quick as possible. As we generally see in the summer, adoption and donation levels are low, but drop offs are high. That means we need to scrape up every penny we have just to be able to afford the expenses at our current location including rent, utilities, medical bills, and daily supplies - all while trying to cover the cost of the construction at the new location.
So far we have raised $1,901.00, and we are very grateful to our donors. Without our donors, we wouldn't have the ability to rescue and rehabilitate homeless cats. Thank you for continuing to support our mission!
We Started Some Demo!
We began some demo with the assistance of Big Jim's Clean-ups (http://bigjimscleanups.com).
The next stage is to have the roof repaired, HVAC systems, electric, and everything unexpected that comes along with a typical construction job.
The next stage is to have the roof repaired, HVAC systems, electric, and everything unexpected that comes along with a typical construction job.
We Need to Start Fresh!
This is your first look inside our new location. As you can see it is in desperate need of repairs and renovations, which is why we started crowdfunding. Work will begin soon!